Agnipankh.
Government & PSU · P2 segment

Aligned with national policy. Tender-ready by design.

We’re building OttoE100 to PSU deployment standards from the outset — documented, audit-driven, and aligned with the Ministry of Petroleum’s ethanol blending roadmap. Production-grade certification (CPCB IV+ TAC) is sequenced for Dec 2026.

The reality today

What we hear from the field.

Compliance burden

PSU procurement requires extensive documentation, certifications, and audit trails. Most clean-energy startups can’t meet PSU evidence standards.

Indigenous tech preference

National policy increasingly favors made-in-India clean energy. Imported alternatives face procurement friction; localized manufacturing wins.

Decentralized power mandates

Distributed, low-emission power systems are explicitly aligned with India’s net-zero commitments and the National Biofuel Policy — but few qualified suppliers exist.

What OttoE100 does

A direct, drop-in replacement.

Certification-first execution: CPCB Consent Letter completed, ARAI bench tests passed, full CVT cycle in progress, 100-hour endurance scheduled, and CPCB IV+ Type Approval Certificate targeted for Dec 2026. Manufactured in Maharashtra with documented quality systems.

  • PSU-grade documentation: test reports, traceability, quality records
  • Indigenous supply chain integrated with localized assembly
  • Compliance with National Biofuel Policy and ethanol blending mandate
  • Pilot deployment with measurable carbon-credit pathways
ARAI
Tested + certified pathway
CPCB IV+
TAC · Dec 2026
Made in
Malkapur, Maharashtra
Biofuel
Policy-aligned
Custom assessment

Tell us about your site.

Share your load profile and we’ll send a tailored TCO model, a deployment plan, and a pilot proposal — usually within 48 hours.

hello@ottoe100.com
+91 83295 68105

We’ll respond within 48 hours.